Tuesday 3 March 2015

Foundation Inspection

This afternoon @ 3 pm we had our 'pre-pour/foundation' inspection conducted by Darren from Darbecca Pty Ltd.

When we arrived, the slab team were still completing the final touches. The inspector went ahead to inspect the works that have been completed so far. Communication from the Slab Supervisor was very poor. I had text him photos of the damaged pipes this morning and no response. Fortunately, the drain for the laundry that was broken had been temporarily repaired by a plumber as it would have held up the pour. The broken downpipe drain is still to be repaired and the inspector picked up on that and marked it. 

Even though most issues were rectified on the spot as the inspector pointed them out (nothing major), we still received a full report from him.

Rememberer my concern about the reduced FL of the house and site drainage? Turns out I was right! Here is what the inspector had to say in the report. 


Finally, the exciting part.... Some more photos, enjoy :)